image

Eisa

Last login: 1 second ago

Mechanical Engineering and Supply chain

Skills and tools

Excel
Analytical skills
Team Management

Contact Eisa

Terms & Conditions Terms and Conditions

About me

I am a mechanical engieer, graduted from unversity of khartoum in 2007, i am also Certifed in the following:

    • Project management professional  (PMP)
    • Six sigma
    • Supply chain
    • Procurement and contracting management
    • Risk management
    • ISO 9001:2015 Quality Management System Internal Auditing

Education

-12/11/2007
BSc in mechanical engineering
University of Khartoum,

<!--[if gte mso 10]> /* Style Definitions */ table.MsoNormalTable{mso-style-name:"Table Normal";mso-tstyle-rowband-size:0;mso-tstyle-colband-size:0;mso-style-noshow:yes;mso-style-priority:99;mso-style-parent:"";mso-padding-alt:0in 5.4pt 0in 5.4pt;mso-para-margin:0in;mso-para-margin-bottom:.0001pt;mso-pagination:none;text-autospace:none;font-size:11.0pt;font-family:"Calibri","sans-serif";mso-ascii-font-family:Calibri;mso-ascii-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font:minor-latin;}<![endif]-->Bachelor of Science in Mechanical  Engineering

Work Experience

23/12/2015 -Currently working
Project Engineer
LG Sudan - Central Trading Company (CTC Group)

▪ Prepare project’s budget, and managing all project expenses to insure the peak profitability of the project.
▪ Prepare and update project time schedule and monitoring all the project activities to make sure of that all activities will be executed in the planned time and assigning delay causes to be solved in appropriate time.
▪ Determine the required materials quantities for the project precisely according to the approved shop drawings to avoid any unacceptable deficiency in the materials which leads to project delay.
▪ Contact with the suppliers and inspect site’s arrived materials to make sure of that all materials as per ordered in terms of quality and quantity.
▪ Follow up installation materials status during the project to assign the proper time to be delivered to the site to avoid any delay in works progressing.
▪ Leading and directing LG installation teams and subcontractors’ teams prepare daily tasks for labours and follow up technical site activities to make sure all technical details are executed as per designed and required.
▪ Coordinate and communicate with other project’s engineers to make sure that works are going as planned and solve any site's problems that may arise during the project progressing.
▪ Prepare project documentations, submissions, inspections and shop and as build drawings for consultant approval.
▪ Prepare Project progress reports

01/06/2013 -22/12/2015
Maintenance Engineer
Abuabid International Group for investment

▪ Supervising Installation and commissioning and maintenance of Generator Set (including all electrical wiring and ATS units) suitable for Zain Telecommunication Networks sites
▪ Supervising routine services of power equipment according to manufacturer’s specifications
▪ Supervising Major overhauls and Emergency repairs
▪ Managing Fuel Supplies
▪ Coordinating Manufacturing of fuel tanks, this includes metal works and installation, grounding and piping works
▪ Supervising Installation, commissioning and maintenance of Air Conditioning Systems required for Zain Telecommunication Networks sites
▪ Managing all major and minor services (most services are carried out on location)

14/09/2009 -29/05/2013
Sales Engineer
Switch for Trading & Engineering,

<!--[if gte mso 10]> /* Style Definitions */ table.MsoNormalTable{mso-style-name:"Table Normal";mso-tstyle-rowband-size:0;mso-tstyle-colband-size:0;mso-style-noshow:yes;mso-style-priority:99;mso-style-parent:"";mso-padding-alt:0in 5.4pt 0in 5.4pt;mso-para-margin:0in;mso-para-margin-bottom:.0001pt;mso-pagination:none;text-autospace:none;font-size:11.0pt;font-family:"Calibri","sans-serif";mso-ascii-font-family:Calibri;mso-ascii-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font:minor-latin;}<![endif]-->▪ Coordinated with customers, forecasted requirements and ensured good service facilities to the customers.
▪ Answered all requests made by customers on the products, equipments and services offered.
▪ Generated new accounts for the Company identified the potential customers for the Company and scheduled the sales calls accordingly.
▪ Coordinated with the engineers and technical personnel, interpreted the blueprints and prepared an estimate for the project.
▪ Trained the staff maintained by the customer and provided them with all necessary technical information.
▪ Prepared sales engineering reports, summarized sales information and application trends in industry

Awards and Certificates

1/03/2017 -26/03/2017
PMP® : Project Management Professionalcertification
Project Management Institute, Newtown, Pennsylvania (USA)

The Project Management Professional (PMP) is a globally recognized professional certification developed by leading organizations and project managers around the world

01/06/2015 -08/06/2015
Advanced certificate in procurement and contracting management
Outsource training centre,

▪ Procurement RtP.
▪ Overseas procurement.
▪ Suppliers’ management.
▪ Negations with suppliers.
▪ Contracts management.
▪ Tender management.
▪ E-procumbent.

03/07/2017 -26/08/2017
Six sigma yellow belt professional
6sigmastudy training provider, London (United Kingdom)

Six Sigma Yellow Belt

01/04/2019 -22/04/2019
Project Risk Management (PMI-RMP®) with primavera Risk analysis
Milestone Training Center

PMI® Risk Management Professional (PMI-RMP) ® Exam Preparation training sessions, with hands- on practical on Oracle Primavera Risk Analysis®.

21/04/2019 -25/04/2019
Primavera P6 Professional
Baselines for training and human

Primavera is enterprise project portfolio management software

05/01/2020 -09/01/2020
Supply Chain Management
Outsource training centre

supply chain management

Candidates Reviews:

Uploading